Customization: | Available |
---|---|
After-sales Service: | Engineers Can Be Sent to The Worksite |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Watch / Jewelry Vacuum Plating PVD Coating Machine
Machine Photos |
Technical Spcifications |
Model Number | ARC-1000 | ARC-1200 | ARC-1400 | ARC-1800 | ARC-2000 |
Dimension of vacuum chamber(diameter*height) | 1000*1100 | 1200*1400 | 1400*1600 | 1800*2000 | 2000*2200 |
Material of vacuum chamber | SUS304 or SUS316L with cooling jacket | ||||
Quantity of arc sources | 8-12 sets | 10-14 sets | 12-16 sets | 14-24 sets | 18-36 sets |
Pumping system | molecular pump or diffusion pump+mechanical pump | molecular pump or diffusion pump+mechanical pumps, booster pump | |||
Pumping Time | From atmosphere to 5.0*10-2Pa less than 8 minutes | ||||
Bias Power Supply | 20kW | 30kW | 40kW | 60kW | 60kW |
Gas distribution System with Mass Flow Controllers | ≥2 sets | ||||
Vacuum Limit | 5.0*10-4 Pa | ||||
Working temperature | 100-250 centigrades | ||||
Working mode | Automatic or Manual mode, by 10.4 inches PLC touches screen | ||||
Total Power | 70-180kW | 70-180kW | 70-180kW | 120-300kW | 120-300kW |
Footprint | 3*3 meters | 3*3 meters | 3*4 meters | 4*5 meters | 4*5 meters |
1. The inner packing is protective plastic film to protect the PVD machine from moisture and rain.
2. The out packing is plywood plate with steel to keep the PVD machine in good condition during the long distance transportation.
After the customer tested the PVD coating machine and make sure the machine is no problem, we will take the machine apart. The solid packing can make sure you will receive a machine without any destroy.
1. What size of the PVD coating machine do you have?
Answer: We do have different models of PVD coating machine. But usually we recommend the machine according to the size of the max. parts of customers. Since we have seen the drawing of pcs from you, we will make sure the machine can coat all of your pcs and reaches to the desired capacity.
2. What material do I need for running the machine?
Answer: We will send you a list of the raw material and spare parts for your kind reference.
3. Do I need pretreatment or other machines for the PVD process?
Answer:
When you choose different machine, you will need:
For Vacuum Metallizing Machine: Air Compressor, Chiller, (UV) Painting & Coloring Line
For Magnetron Sputtering Machine:Air Compressor, Chiller, (UV) Painting Line, High Purity Gases
For Arc Ion Plating/Deposition Machine:Air Compressor, Chiller, Ultrasonic Washer, Pure Water Machine, High Purity Gases
You could also need the transformer(from 380V 50Hz to your local voltage.)
4. What is my guarantee if I order from you?
Answer:
We have been exported the PVD coating machine for more than 10 years and our vacuum equipment were installed in more than 20 countries all over the world. We have good reputation on the quality and our service.
5. Who will install the machine?
Answer: We will send our specialists to your worksite to provide all technical assistances for the PVD machine.
6. If the customer would like to have a visit, what is the nearest airport city in which the company is located?
Answer: Changsha Huanghua Airport
7. How far the factory is from Guangzhou?
Answer: By fast train only 2.5 hours from Guangzhou South railway station.
For more details, please contact us.