Customization: | Available |
---|---|
After-sales Service: | Engineers Can Be Sent to The Worksite |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Car Headlights Vacuum Chrome Plating Machine
EV series, based on the thermal evaporation technology, are the most suitable coating system for producing reflective chrome like colors on kinds of plastic, glass, etc.
Photos of the vacuum metallizing machine |
Layout:
Model | EV series |
Vacuum Chamber | SUS304/Carbon Steel, φ1000mm-2000×1000-2000mm (H) |
Substrate Dome Size | Depends on the customer's needs |
Substrate Dome Rotation Speed | 10 rpm to 50 rpm (Variable) |
Aluminum Evaporation Source | 1 or 2 sets |
Vacuum System | Roughing Pump, Diffusion Pumps or Turbo Molecular Pump + Mechanical pumps |
Ultimate Pressure | 2.0×10-3 Pa or lower |
Pump Down Rate | 10 minutes (Atm. to 5.0×10-2 Pa) |
Substrate Carousel | For holding the substrates |
Layout Dimensions | 5000mm (W)×6500mm (L)×3500mm (H) approx. |
Power Requirements | 3-phase, 380V, 50/60Hz, 100-180kVA approx. |
Cooling Water Flow Rate | 140/min. or greater |
Compressed Air Pressure | 0.5MPa or higher |
Gross Weight | 8500kg approx. |
Xiangtan Hondson Coating Technology Co., Ltd. has enjoyed conspicuous success in the design, manufacture of PVD Vacuum Coating Machines. We are specialized in innovative PVD technology, as well as equipment for various applications, including electronics, thin film deposition, vacuum coated glass, automotive, plastic decorations, harden protective coatings on tools, molds, drills, knives, etc. Our high quality Vacuum Coaters are sold to foreign and domestic markets and win their praise and good graces. We are happy to establish business relationship with customers all over the world. If you are interested in our products, or you are looking for cooperation partners in China for Vacuum Coating Equipment, welcome to contact us for further information. Every machine is designed according to customer's real requests.
1. The inner packing is protective plastic film to protect the PVD machine from moisture and rain.
2. The out packing is plywood plate with steel to keep the PVD machine in good condition during the long distance transportation.
After the customer tested the PVD coating machine and make sure the machine is no problem, we will take the machine apart. The solid packing can make sure you will receive a machine without any destroy.
1. What size of the PVD coating machine do you have?
Answer: We do have different models of PVD coating machine. But usually we recommend the machine according to the size of the max. parts of customers. Since we have seen the drawing of pcs from you, we will make sure the machine can coat all of your pcs and reaches to the desired capacity.
2. What material do I need for running the machine?
Answer: We will send you a list of the raw material and spare parts for your kind reference.
3. Do I need pretreatment or other machines for the PVD process?
Answer:
When you choose different machine, you will need:
For Vacuum Metallizing Machine: Air Compressor, Chiller, (UV) Painting & Coloring Line
For Magnetron Sputtering Machine:Air Compressor, Chiller, (UV) Painting Line, High Purity Gases
For Arc Ion Plating/Deposition Machine:Air Compressor, Chiller, Ultrasonic Washer, Pure Water Machine, High Purity Gases
You could also need the transformer(from 380V 50Hz to your local voltage.)
4. What is my guarantee if I order from you?
Answer:
We have been exported the PVD coating machine for more than 10 years and our vacuum equipment were installed in more than 20 countries all over the world. We have good reputation on the quality and our service.
5. Who will install the machine?
Answer: We will send our specialists to your worksite to provide all technical assistances for the PVD machine.
6. If the customer would like to have a visit, what is the nearest airport city in which the company is located?
Answer: Changsha Huanghua Airport
7. How far the factory is from Guangzhou?
Answer: By fast train only 2.5 hours from Guangzhou South railway station.